Summary of Proposed Field Work The proposed work is to take place over the 2000/01 field season. The table below shows the number of flights and days required for the proposed work. The estimated number of flights in the table requires a base of operation directly east or west of the main survey grid, centrally located along its length. These estimates do not include time or flights required for aircraft configuration ans testing.
|
||||
Work Vostok Detailed Survey Regional Lines Totals |
Line-km 11,745 ~3600 15,457 |
Flights 28 7 35 |
Days Required @ 1.5 flights/day 15 4 19 |
Days Required @ 2.5 flights/day 15 4 19 |
Notes: 2000/01 Field Season 1.
Plans for the SOAR facility during the 2000/01 have not been finalized.
SOAR is evaluating the need for equipment refitting in the near future. |